Batting order for future panels
Rh wing, pressing complete for side section
Lh wing pressing early next week
Rear light area of rear wings early next
Sport number plate light cover and suspension cone early next week
Inner rear wheel arches tab
Front wing tool has been delivered to the press shop today and a plan made for the press work
Front wings complete pressing with redesigned tool approx £250
Front wing repair panel £125 approx 10 days
Inner front arch, £125 each
Lead time on front wings 7-10 days for pressings, and then I will need time to finish them.
(Feed generated with ********)
More...
Rh wing, pressing complete for side section
Lh wing pressing early next week
Rear light area of rear wings early next
Sport number plate light cover and suspension cone early next week
Inner rear wheel arches tab
Front wing tool has been delivered to the press shop today and a plan made for the press work
Front wings complete pressing with redesigned tool approx £250
Front wing repair panel £125 approx 10 days
Inner front arch, £125 each
Lead time on front wings 7-10 days for pressings, and then I will need time to finish them.